Insulating the Headquarters Hut
After all the framing prep we had done, there were just a few things left to do to get the Headquarters Hut ready to insulate. Final Prep for Insulation One thing we almost forgot to do was take down the lights! I got a last minute picture before we started this...

Loft House Septic System Connection
We'd been trying for months - basically all spring and summer - to get the main waste line for the Loft House connected to the septic system. There are a couple of crews that we have used for grading and excavating at the property and everyone was just too booked up...

Quonset Loft House Window Installation
Carried along by the momentum the Loft House gained from the interior and end wall framing, it was exciting to follow up with the window installation. There isn't a ton of Quonset-specific technical knowledge to impart here; the windows were installed in a relatively...

Quonset Loft House End Wall Attachment
Here's a quick rundown of how we did the final bracing at the top of the arched header, at the big window wall. If you are new to the blog, this is the third in a series on the framing of our house; you can read part 1 on interior framing here and part 2 on the big...

Quonset Loft House Window Wall Framing
It's one thing to draw something up, even something that takes a lot of thought, and hand it over to a General Contractor to build; it's quite another to design something complicated and intricate and have to figure out every single part of it because you're building...